Before the first shovel
Installation really starts at your kitchen table. A site visit, your survey and a soil report give the designers and engineers what they need to plan the pool for your ground. Engineered drawings are then submitted for permits.
This is also the best time to make changes. Moving a step, resizing a spa or adding a feature is simple on paper and much harder once the steel is in.
Living with a construction site
Excavation means heavy equipment in the yard, so access is planned ahead. Fences may be opened, gates widened and a route set for the trucks. Inspections happen at several stages, and work moves forward as each one passes.
Your project manager is your main point of contact throughout the build and keeps you informed at every stage, so you always know what is coming next.
The finishing stretch
Once the shell is shot, the pool starts to look like the design. Tile, coping, decking, equipment and the interior finish follow, then the pool is filled and started up.
Weather affects the schedule in Central Texas. Rain can pause excavation and concrete work, which is why timelines are given as a range.